Full restoration of a five-bedroom Georgian flat with mixed old pipework and two bathrooms being rebuilt.
New copper supply from the rising main, new ABS soil stack, two bathrooms and en suite, with pipe routes coordinated around joinery.
Eight weeks alongside the wider architect-led restoration.
Concealed pipework, pressure-tested before close-up, handed over ready for final finishes.